Ship passing Gamboa.
Photo and caption by: The Panama Canal Company - Graphics Branch 
A large cargo ship is passing the bridge which crosses over the Chagres River at the mid point of the Panama Canal. Ahead lies a portion of the 8-mile long Gaillard Cut which was excavated in order to connect Gatun Lake with the Pacific Locks.
Click anywhere in image to return to the 1960's Photo Album.
Reverse Photo Album Navigation  Forward
Previous photo. Select arrow for image selection View the next photo.

Canal Zone Seal.

A special presentation for CZVets.com by:
Joseph W. DuVall
April 10, 2000

/ czvets /